Buildings
- There is no dedicated target for heat pump deployment in Croatia, but the revised NECP sets an ambitious target of 47.1% renewable energy in the heating and cooling sector by 2030. [25]
Electricity production in Croatia closely matches demand, with 17 541 GWh produced in 2023.[1]
Croatia imports 9.7% of its electricity final electricity consumption.
Electricity represents 20% of Croatia’s final energy consumption.

Sources [6]


Sources [7]
Electric Vehicles (EVs)Co-financing for new electric or hydrogen vehicles (purchase or financial leasing).
A €20 million national funding pool providing direct purchase subsidies of up to €9,000 for electric passenger cars (M1) to accelerate private green mobility transition.
A targeted €45 million allocation to specifically support high-mileage commercial operators to convert fleets to zero-emission vehicles (BEVs).
Battery electric vehicles (BEVs) are completely exempt from the annual road tax and the special annual environmental tax collected during vehicle registration.
Direct co-financing from a €10 million dedicated heat pump pool:
Grants co-funded via carbon allowance revenues and the National Recovery and Resilience Plan (NPOO) for building-wide deep retrofits. Covers up to 60–80% of costs when replacing inefficient centralized fossil-fuel heating with centralized heat pumps.
A specialized €25 million social fund providing up to 70% cost coverage for installing modern energy-efficient heating systems (like air-to-water heat pumps) to combat low incomes and inefficient building stock.
IndustryAn €80 million program funded by national and EU resources targeting industrial thermal transition. It offers direct capital grants of up to €30 million per project to shift industrial process heat from fossil fuels to high-capacity heat pumps and RES.
Subsidizes the installation of self-consumption solar PV plants and battery energy storage systems (BESS) to lower grid dependence and power electrified manufacturing equipment.
Highly competitive, multi-million-euro direct grants supporting first-of-a-kind deep-decarbonization process conversions (e.g., integrating solar thermal, waste heat recovery, and large-scale 8 MW heat pumps in drying processes).
While the country possesses high renewable generation potential, severe grid congestion has created a massive bottleneck, stalling over €3 billion in renewable energy projects and locking out over 3,500 MW of planned wind, solar, and battery storage capacity. This is heavily exacerbated by aging infrastructure, with over 60% of transmission lines exceeding 40 years of age, and a critical geographical mismatch: the sunny, windy southern regions produce clean energy that cannot be efficiently transmitted to the high-demand western and northern areas due to a lack of high-voltage transmission lines.
In the built environment, Croatia’s heat pump market remains highly nascent with only 8,000 units sold in 2024, hampered further by an acute deficit of 24,500 qualified HVAC and energy-renovation workers. Furthermore, 80% to 85% of Croatia’s district heating systems – which supply 14% of the country’s heat – remain heavily reliant on fossil natural gas.
In transport, electrification is practically non-existent, sitting at a mere 3.74% with a total EV stock of just 13,385 vehicles in 2026.
Finally, despite high-capacity funding programs, Croatia’s top industrial electricity consumers – led by food and beverages (22-25%) and non-metallic mineral products (18-22%) – lack clear fuel-switching timelines to transition their deep-thermal processing away from fossil fuels.
Heat pump deployment is highly nascent with only 8,000 sales in 2024 and no dedicated national target. District heating remains deeply fossilised, with 80% to 85% of systems run on natural gas.
Electrification stands at a negligible 3.74% of the sector. There are currently no binding national EV deployment targets to drive market momentum.
While ambitious emission reduction targets exist. Croatia’s leading industrial power users (food and beverages, cement, and chemicals) lack clear, mandated phase-down timelines for natural gas, leaving deep-decarbonization efforts heavily reliant on voluntary, project-based grant applications.
Clean generation is structurally strong; 47% of Croatia’s electricity is generated by hydropower and wind has reached 14.7% of the mix, leading to more than 73% of domestic generation coming from renewable sources in high-water years. Coal has been successfully reduced to around 7% of generation.
Severe grid congestion has completely blocked over €3 billion in renewable projects and 3.5 GW of clean capacity. More than 60% of the transmission grid is over 40 years old, the smart meter rollout is lagging at 40%, and crucial high-voltage corridors to transfer southern wind and solar to western demand centers are delayed.
While Croatia’s updated NECP significantly boosted 2030 targets – nearly doubling the transport renewable target to 24.6% and raising the heating renewable target to 47.1% – these aggressive paper targets are heavily undermined by a lack of concrete sectoral strategies, critical workforce shortages, and severe grid capacity bottlenecks.